Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 158 tok/s
Gemini 2.5 Pro 49 tok/s Pro
GPT-5 Medium 34 tok/s Pro
GPT-5 High 28 tok/s Pro
GPT-4o 74 tok/s Pro
Kimi K2 199 tok/s Pro
GPT OSS 120B 434 tok/s Pro
Claude Sonnet 4.5 36 tok/s Pro
2000 character limit reached

Design and FPGA Implementation of WOMBAT: A Deep Neural Network Level-1 Trigger System for Jet Substructure Identification and Boosted $H\rightarrow b\bar{b}$ Tagging at the CMS Experiment (2505.05532v2)

Published 8 May 2025 in physics.ins-det and hep-ex

Abstract: This thesis investigates the physics performance, trigger efficiency, and Field Programmable Gate Array (FPGA) implementation of ML-based algorithms for Lorentz-boosted $H\rightarrow b\bar{b}$ tagging within the CMS Level-1 Trigger (L1T) under Phase-1 conditions. The proposed algorithm, WOMBAT (Wide Object ML Boosted Algorithm Trigger), comprises a high-performance Master Model (W-MM) and a quantized, FPGA-synthesizable Apprentice Model (W-AM), benchmarked against the standard Single Jet 180 and the custom rule-based JEDI (Jet Event Deterministic Identifier) triggers. All algorithms process calorimeter trigger primitive data to localize boosted $H\rightarrow b\bar{b}$ jets. Outputs are post-processed minimally to yield real-valued $(\eta, \phi)$ jet coordinates at trigger tower granularity. Trigger rates are evaluated using 2023 CMS ZeroBias data (0.64 fb${-1}$), with efficiency assessed via a Monte Carlo sample of $H\rightarrow b\bar{b}$ offline reconstructed AK8 jets. W-MM achieves a 1 kHz rate at an offline jet $p_T$ threshold of 146.8 GeV, 40.6 GeV lower than Single Jet 180, while maintaining comparable signal efficiency. W-AM reduces the threshold further to 140.4 GeV, with reduced efficiency due to fixed-output constraints and limited multi-jet handling. FPGA implementation targeting the Xilinx Virtex-7 XC7VX690T confirms that W-AM meets resource constraints with a pre-place-and-route latency of 22 clock cycles (137.5 ns). In contrast, JEDI requires excessive resource usage and a 56-cycle latency, surpassing the 14-cycle L1T budget. Originally developed for Run-3 CMS L1T, WOMBAT serves as a proof-of-concept for Phase-2 triggers, where hardware advances will enable online deployment of more sophisticated ML-based L1T systems.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.