Online and semi-online scheduling on two hierarchical machines with a common due date to maximize the total early work (2209.08704v1)
Abstract: In this study, we investigated several online and semi-online scheduling problems on two hierarchical machines with a common due date to maximize the total early work. For the pure online case, we designed an optimal online algorithm with a competitive ratio of $\sqrt 2$. For the case when the total processing time is known, we proposed an optimal semi-online algorithm with a competitive ratio of $\frac{4}{3}$. Additionally, for the cases when the largest processing time is known, we gave optimal algorithms with a competitive ratio of $\frac{6}{5}$ if the largest job is a lower hierarchy one, and of $\sqrt 5-1$ if the largest job is a higher hierarchy one, respectively.
Collections
Sign up for free to add this paper to one or more collections.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.