Impact of DER Communication Delay in AGC: Cyber-Physical Dynamic Simulation
Abstract: Distributed energy resource (DER) frequency regulations are promising technologies for future grid operation. Unlike conventional generators, DERs might require open communication networks to exchange signals with control centers, possibly through DER aggregators; therefore, the impacts of the communication variations on the system stability need to be investigated. This paper develops a cyber-physical dynamic simulation model based on the Hierarchical Engine for Large-Scale Co-Simulation (HELICS) to evaluate the impact of the communication variations, such as delays in DER frequency regulations. The feasible delay range can be obtained under different parameter settings. The results show that the risk of instability generally increases with the communication delay.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.