Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 84 tok/s
Gemini 2.5 Pro 37 tok/s Pro
GPT-5 Medium 18 tok/s Pro
GPT-5 High 15 tok/s Pro
GPT-4o 86 tok/s Pro
GPT OSS 120B 468 tok/s Pro
Kimi K2 229 tok/s Pro
2000 character limit reached

Towards the processing, review, and delivery of 80% of the ALMA data by the Joint ALMA Observatory (JAO) (2101.03427v1)

Published 9 Jan 2021 in astro-ph.IM and physics.data-an

Abstract: After eight observing Cycles, the Atacama Large Millimeter-submillimeter Array (ALMA) is capable of observing in eight different bands (covering a frequency range from 84 to 950 GHz), with 66 antennas and two correlators. For the current Cycle (7), ALMA offers up to 4300 hours for the 12-m array, and 3000 hours on both the 7-m of the Atacama Compact Array (ACA) and TP Array plus 750 hours in a supplemental call. From the customer perspective (i.e., the astronomical community), ALMA is an integrated product service provider, i.e. it observes in service mode, processes and delivers the data obtained. The Data Management Group (DMG) is in charge of the processing, reviewing, and delivery of the ALMA data and consists of approximately 60 experts in data reduction, from the ALMA Regional Centers (ARCs) and the Joint ALMA Observatory (JAO), distributed in fourteen countries. Prior to their delivery, the ALMA data products go through a thorough quality assurance (QA) process, so that the astronomers can work on their science without the need of significant additional calibration re-processing. Currently, around 90% of the acquired data is processed with the ALMA pipeline (the so called pipeline-able data), while the remaining 10% is processed completely manually. The Level-1 Key Performance Indicator set by the Observatory to DMG is that 90% of the pipeline-able data sets (i.e. some 80% of the data sets observed during an observing cycle) must be processed, reviewed and delivered within 30 days of data acquisition. This paper describes the methodology followed by the JAO in order to process near 80% of the total data observed during Cycle 7, a giant leap with respect to approximately 30% in Cycle 4 (October 2016 - September 2017).

Citations (1)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Ai Generate Text Spark Streamline Icon: https://streamlinehq.com

Paper Prompts

Sign up for free to create and run prompts on this paper using GPT-5.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.