Papers
Topics
Authors
Recent
Search
2000 character limit reached

Short-term Operational Planning Problem of the Multiple-Energy Carrier Hybrid AC/DC Microgrids

Published 23 Dec 2020 in eess.SY and cs.SY | (2012.12788v1)

Abstract: In this paper, the short-term operation problem for a multiple energy carrier hybrid AC/DC microgrid is discussed. The hybrid microgrid consists of AC and DC parts, which are connected by means of inverters as well as natural gas network. The microgrid includes photovoltaic (PV) unit, wind turbine (WT), battery storage unit and gas-fired microturbines. A mixed integer linear programming is formed to minimize the overall cost of the microgrid including cost of natural gas supply, the value of lost load and battery degradation cost. The presented case study explored the importance of inverter characteristics and pipeline capacity.

Citations (3)

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.