Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 164 tok/s
Gemini 2.5 Pro 46 tok/s Pro
GPT-5 Medium 21 tok/s Pro
GPT-5 High 27 tok/s Pro
GPT-4o 72 tok/s Pro
Kimi K2 204 tok/s Pro
GPT OSS 120B 450 tok/s Pro
Claude Sonnet 4.5 34 tok/s Pro
2000 character limit reached

Robust transport over networks (1603.08129v1)

Published 26 Mar 2016 in cs.SY

Abstract: We consider transport over a strongly connected, directed graph. The scheduling amounts to selecting transition probabilities for a discrete-time Markov evolution which is designed to be consistent with certain initial and final marginals. The random evolution is selected to be closest to a prior measure on paths in the relative entropy sense, i.e., a Schroedinger bridge between the two marginals. This is an atypical stochastic control problem where the control consists in suitably modifying the transition mechanism. The prior can incorporate cost of traversing edges or allocate equal probability to all paths of equal length connecting any two given nodes, i.e., a uniform measure on paths. This latter choice relies on the so-called Ruelle-Bowen random walk and gives rise to a scheduling that tends to utilize all paths as uniformly as the topology allows. Thus, when the Ruelle-Bowen law is taken as prior, the transportation plan tends to lessen congestion and ensure a level of robustness. We show that the Ruelle-Bowen law is itself a Schroedinger bridge albeit with a prior that is not a probability measure. The paradigm of Schroedinger bridges as a mechanism for scheduling transport on networks can be adapted to graphs that are not strongly connected as well as to weighted graphs. The latter leads to transportation plans that effect a compromise between robustness and transportation cost.

Citations (37)

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.