Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Uncertainty-Aware Planning for Heterogeneous Robot Teams using Dynamic Topological Graphs and Mixed-Integer Programming (2310.08396v5)

Published 12 Oct 2023 in cs.RO

Abstract: Multi-robot planning and coordination in uncertain environments is a fundamental computational challenge, since the belief space increases exponentially with the number of robots. In this paper, we address the problem of planning in uncertain environments with a heterogeneous robot team of fast scout vehicles for information gathering and more risk-averse carrier robots from which the scouts vehicles are deployed. To overcome the computational challenges, we represent the environment and operational scenario using a topological graph, where the parameters of the edge weight distributions vary with the state of the robot team on the graph, and we formulate a computationally efficient mixed-integer program which removes the dependence on the number of robots from its decision space. Our formulation results in the capability to generate optimal multi-robot, long-horizon plans in seconds that could otherwise be computationally intractable. Ultimately our approach enables real-time re-planning, since the computation time is significantly faster than the time to execute one step. We evaluate our algorithm in a scenario where the robot team must traverse an environment while minimizing detection by observers in positions that are uncertain to the robot team. We demonstrate that our method is computationally tractable, can improve performance in the presence of imperfect information, and can be adjusted for different risk profiles.

Citations (1)

Summary

We haven't generated a summary for this paper yet.