Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
184 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Coordinated Optimization at a Hydro Generating Plant by Software Agents (1607.04812v1)

Published 17 Jul 2016 in cs.SY

Abstract: The architecture is developed for incorporating a software agent into the existing control system of a river-based hydro generating plant. The software agent will utilize a rule-based system for ease of integration. Optimization for increased power production is presented, initially for a single generating unit. An enhancement to facilitate the constraints of river level and flow by an external user as well as the goals of corporate dispatching is then developed through the existing SCADA system. Finally, expansion to coordinate multiple hydro units at a single location is presented.

Citations (4)

Summary

We haven't generated a summary for this paper yet.