Papers
Topics
Authors
Recent
Search
2000 character limit reached

The VELO Upgrade

Published 20 Dec 2014 in physics.ins-det and hep-ex | (1412.6655v1)

Abstract: A significant upgrade of the LHCb detector is scheduled to be installed in 2018-2019. Afterwards all sub-detectors will be read out at the LHC bunch crossing frequency of 40 MHz and the trigger will be fully implemented in software. The silicon strip vertex detector will be replaced by a hybrid pixel detector. In these proceedings the following items are discussed: frontend ASIC, data rates, data transmission, cooling, radiation hard sensors, module design and simulated performance.

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

Collections

Sign up for free to add this paper to one or more collections.