Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
156 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Approximation Algorithms for the Joint Replenishment Problem with Deadlines (1212.3233v3)

Published 13 Dec 2012 in cs.DS

Abstract: The Joint Replenishment Problem (JRP) is a fundamental optimization problem in supply-chain management, concerned with optimizing the flow of goods from a supplier to retailers. Over time, in response to demands at the retailers, the supplier ships orders, via a warehouse, to the retailers. The objective is to schedule these orders to minimize the sum of ordering costs and retailers' waiting costs. We study the approximability of JRP-D, the version of JRP with deadlines, where instead of waiting costs the retailers impose strict deadlines. We study the integrality gap of the standard linear-program (LP) relaxation, giving a lower bound of 1.207, a stronger, computer-assisted lower bound of 1.245, as well as an upper bound and approximation ratio of 1.574. The best previous upper bound and approximation ratio was 1.667; no lower bound was previously published. For the special case when all demand periods are of equal length we give an upper bound of 1.5, a lower bound of 1.2, and show APX-hardness.

Citations (28)

Summary

We haven't generated a summary for this paper yet.