Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
153 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Une approche par les modèles pour le suivi de l'activité de construction d'un bâtiment. Bat'iViews : une interface multi-vues orientée gestion de chantier (0711.2811v1)

Published 18 Nov 2007 in cs.HC

Abstract: Cooperation between actors in design and construction activities in architecture is an essential stake nowadays. In professional practices the actors involved in construction projects use numerous tools. The project is unique but the "views" that actors manipulate are various and sometimes fundamentally different. Their common characteristic is that they partially represent the cooperation context through a specific point of view. "Bat'iViews" suggests to the actors a multi-view interface of the context and enables to navigate through the different views. This proposition is based on a model-driven approach. We distinguish between "context modelling" and modelling of concepts represented in each "businessview". A model integrative infrastructure allows us to develop the prototype and to manage user interaction through the definition of models' transformations.

Citations (1)

Summary

We haven't generated a summary for this paper yet.