Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Monetarization of the Feasible Operation Region based on a Cost-Optimal Flexibility Disaggregation (2111.02810v1)

Published 4 Nov 2021 in eess.SY and cs.SY

Abstract: Hierarchical multi-(voltage-)level grid control strategies are an appropriate design concept for the coordination of future TSO/DSO- and DSO/DSO-interactions. Hierarchical approaches are based on the aggregation of decentralized ancillary service potentials, represented by converter-coupled, communicable active and reactive power flexibility providing units (FPU) (e.g. wind turbines) at vertical system interfaces. The resulting PQ-polygon made available by the DSO for a potential request of ancillary service flexibilities by the TSO is called feasible operation region (FOR). A monetarization of the FOR is necessary for the implementation as operational degree of freedom within higher-level grid control. This paper presents an approach for the monetarization of the FOR in the context of a hierarchical multi-level flexibility market by a cost structure using metadata from population based optimization methods. Multiple FPU flexibility polygons at a single bus are aggregated for a reduction of the search space dimensions. The main contribution of the proposed method is the cost-optimal disaggregation of a flexibility demand to the single FPUs within the aggregated FPU by a mixed integer linear program (MILP). Therefore, a local flexibility market considering bids for the active and reactive power flexibilities by the FPUs stakeholders is assumed. The approach is applied within a case-study of the Cigr\'e medium voltage system.

Citations (4)

Summary

We haven't generated a summary for this paper yet.