Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
125 tokens/sec
GPT-4o
53 tokens/sec
Gemini 2.5 Pro Pro
42 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
47 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

EPTAS for load balancing problem on parallel machines with a non-renewable resource (2108.04071v1)

Published 9 Aug 2021 in cs.DS, cs.DM, and math.OC

Abstract: The problem considered is the non-preemptive scheduling of independent jobs that consume a resource (which is non-renewable and replenished regularly) on parallel uniformly related machines. The input defines the speed of machines, size of jobs, the quantity of resource required by the jobs, the replenished quantities, and replenishment dates of the resource. Every job can start processing only after the required quantity of the resource is allocated to the job. The objective function is the minimization of the convex combination of the makespan and an objective that is equivalent to the $l_p$-norm of the vector of loads of the machines. We present an EPTAS for this problem. Prior to our work only a PTAS was known in this non-renewable resource settings and this PTAS was only for the special case of our problem of makespan minimization on identical machines.

Summary

We haven't generated a summary for this paper yet.