Scheduling on parallel machines with a common server in charge of loading and unloading operations (2306.16669v1)
Abstract: This paper addresses the scheduling problem on two identical parallel machines with a single server in charge of loading and unloading operations of jobs. Each job has to be loaded by the server before being processed on one of the two machines and unloaded by the same server after its processing. No delay is allowed between loading and processing, and between processing and unloading. The objective function involves the minimization of the makespan. This problem referred to as P2, S1|sj , tj |Cmax generalizes the classical parallel machine scheduling problem with a single server which performs only the loading (i.e., setup) operation of each job. For this NP-hard problem, no solution algorithm was proposed in the literature. Therefore, we present two mixedinteger linear programming (MILP) formulations, one with completion-time variables along with two valid inequalities and one with time-indexed variables. In addition, we propose some polynomial-time solvable cases and a tight theoretical lower bound. In addition, we show that the minimization of the makespan is equivalent to the minimization of the total idle times on the machines. To solve large-sized instances of the problem, an efficient General Variable Neighborhood Search (GVNS) metaheuristic with two mechanisms for finding an initial solution is designed. The GVNS is evaluated by comparing its performance with the results provided by the MILPs and another metaheuristic. The results show that the average percentage deviation from the theoretical lower-bound of GVNS is within 0.642%. Some managerial insights are presented and our results are compared with the related literature.
- Scheduling two parallel machines with a single server: the general case. Computers & Operations Research 2006;33(4):994–1009.
- Tabu search and particle swarm optimization algorithms for two identical parallel machines scheduling problem with a single server. Journal of King Saud University-Engineering Sciences 2019;.
- Allahverdi A, Soroush H. The significance of reducing setup times/setup costs. European Journal of Operational Research 2008;187(3):978–84.
- Arnaout JP. Heuristics for the two-machine scheduling problem with a single server. International Transactions in Operational Research 2017;24(6):1347–55.
- Arnaout JP. Worm optimisation algorithm to minimise the makespan for the two-machine scheduling problem with a single server. International Journal of Operational Research 2021;41(2):270–81.