Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Scheduling with Testing on Multiple Identical Parallel Machines (2105.02052v2)

Published 5 May 2021 in cs.DS

Abstract: Scheduling with testing is a recent online problem within the framework of explorable uncertainty motivated by environments where some preliminary action can influence the duration of a task. Jobs have an unknown processing time that can be explored by running a test. Alternatively, jobs can be executed for the duration of a given upper limit. We consider this problem within the setting of multiple identical parallel machines and present competitive deterministic algorithms and lower bounds for the objective of minimizing the makespan of the schedule. In the non-preemptive setting, we present the SBS algorithm whose competitive ratio approaches $3.1016$ if the number of machines becomes large. We compare this result with a simple greedy strategy and a lower bound which approaches $2$. In the case of uniform testing times, we can improve the SBS algorithm to be $3$-competitive. For the preemptive case we provide a $2$-competitive algorithm and a tight lower bound which approaches the same value.

Citations (6)

Summary

We haven't generated a summary for this paper yet.