Papers
Topics
Authors
Recent
AI Research Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 73 tok/s
Gemini 2.5 Pro 46 tok/s Pro
GPT-5 Medium 13 tok/s Pro
GPT-5 High 14 tok/s Pro
GPT-4o 86 tok/s Pro
Kimi K2 156 tok/s Pro
GPT OSS 120B 388 tok/s Pro
Claude Sonnet 4 37 tok/s Pro
2000 character limit reached

Two-Stage Stochastic Optimization Frameworks to Aid in Decision-Making Under Uncertainty for Variable Resource Generators Participating in a Sequential Energy Market (2012.13459v2)

Published 24 Dec 2020 in math.OC

Abstract: Decisions for a variable renewable resource generators commitment in the energy market are typically made in advance when little information is obtainable about wind availability and market prices. Much research has been published recommending various frameworks for addressing this issue. However, these frameworks are limited as they do not consider all markets a producer can participate in. Moreover, current stochastic programming models do not allow for uncertainty data to be updated as more accurate information becomes available. This work proposes two decision-making frameworks for a wind energy generator participating in day-ahead, intraday, reserve, and balancing markets. The first framework is a two-stage stochastic convex optimization approach, where both scenario-independent and scenario-dependent decisions are made concurrently. The second framework is a series of four two-stage stochastic optimization models wherein the results from each model feed into each subsequent model allowing for scenarios to be updated as more information becomes available to the decision-maker. In the simulation experiments, the multi-phase framework performs better than the single-phase in every run, and results in an average profit increase of 7%. The proposed optimization frameworks aid in better decision-making while addressing uncertainty related to variable resource generators and maximize the return on investment.

Summary

We haven't generated a summary for this paper yet.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.