Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 84 tok/s
Gemini 2.5 Pro 48 tok/s Pro
GPT-5 Medium 21 tok/s Pro
GPT-5 High 28 tok/s Pro
GPT-4o 96 tok/s Pro
GPT OSS 120B 462 tok/s Pro
Kimi K2 189 tok/s Pro
2000 character limit reached

A New Perspective on the Windows Scheduling Problem (1410.7237v1)

Published 27 Oct 2014 in cs.CC and cs.DS

Abstract: The Windows Scheduling Problem, also known as the Pinwheel Problem, is to schedule periodic jobs subject to their processing frequency demands. Instances are given as a set of jobs that have to be processed infinitely often such that the time interval between two consecutive executions of the same job j is no longer than the job's given period $p_j$. The key contribution of this work is a new interpretation of the problem variant with exact periods, where the time interval between consecutive executions must be strictly $p_j$. We show that this version is equivalent to a natural combinatorial problem we call Partial Coding. Reductions in both directions can be realized in polynomial time, so that both hardness proofs and algorithms for Partial Coding transfer to Windows Scheduling. Applying this new perspective, we obtain a number of new results regarding the computational complexity of various Windows Scheduling Problem variants. We prove that even the case of one processor and unit-length jobs does not admit a pseudo-polynomial time algorithm unless SAT can be solved by a randomized method in expected quasi-polynomial time. This result also extends to the case of inexact periods, which answers a question that has remained open for more than two decades. Furthermore, we report an error found in a hardness proof previously given for the multi-machine case without machine migration, and we show that this variant reduces to the single-machine case. Finally, we prove that even with unit-length jobs the problem is co-NP-hard when jobs are allowed to migrate between machines.

Citations (23)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Ai Generate Text Spark Streamline Icon: https://streamlinehq.com

Paper Prompts

Sign up for free to create and run prompts on this paper using GPT-5.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.