Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash 93 tok/s
Gemini 2.5 Pro 35 tok/s Pro
GPT-5 Medium 28 tok/s
GPT-5 High 30 tok/s Pro
GPT-4o 81 tok/s
GPT OSS 120B 439 tok/s Pro
Kimi K2 197 tok/s Pro
2000 character limit reached

On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines (1307.6505v2)

Published 24 Jul 2013 in cs.DS

Abstract: We consider a special case of the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines, European Journal of Operational Research 221 (2012), 7-13.], the authors presented quadratic algorithm for the problem when each job has its smaller processing time on the first machine. In this note, we improve the running time of the algorithm to O(n log n) by efficient implementation using recently introduced modified binary tree data structure.

Citations (5)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.

Authors (1)

Don't miss out on important new AI/ML research

See which papers are being discussed right now on X, Reddit, and more:

“Emergent Mind helps me see which AI papers have caught fire online.”

Philip

Philip

Creator, AI Explained on YouTube