Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

No-Wait Flowshop Scheduling is as Hard as Asymmetric Traveling Salesman Problem (1302.2551v3)

Published 11 Feb 2013 in cs.DS

Abstract: In this paper we study the classical no-wait flowshop scheduling problem with makespan objective (F|no-wait|C_max in the standard three-field notation). This problem is well-known to be a special case of the asymmetric traveling salesman problem (ATSP) and as such has an approximation algorithm with logarithmic performance guarantee. In this work we show a reverse connection, we show that any polynomial time \alpha-approximation algorithm for the no-wait flowshop scheduling problem with makespan objective implies the existence of a polynomial-time \alpha(1+\epsilon)-approximation algorithm for the ATSP, for any \epsilon>0. This in turn implies that all non-approximability results for the ATSP (current or future) will carry over to its special case. In particular, it follows that no-wait flowshop problem is APX-hard, which is the first non-approximability result for this problem.

Citations (6)

Summary

We haven't generated a summary for this paper yet.