Abstract: Flow-based market coupling is substantially altering the computation of cross-zonal capacities for the trade of electricity in the vast majority of European markets. The main benefit of the flow-based method is improved accuracy by better representing the impact of cross-zonal trade on the power flows in transmission grids. Some borders, adjacent to flow-based capacity regions, are represented through net transfer capacities during market coupling. Under the current standard hybrid coupling, the utilization of grid elements in the flow-based regions due to the predicted trade across such borders is not available for trades between flow-based zones. The flow-based representation is not limited to the given capacity calculation region, but can be extended to also model the impact of trade with other regions. This so-called advanced hybrid coupling replaces the priority inherently given to trade across net transfer capacity-coupled borders by introducing virtual bidding zones. These map the effect of non-flow-based borders on line capacities in the flow-based regions, enabling the market coupling optimization to prioritize trade between flow-based bidding zones and trade across non-flow-based borders. This paper explains the mechanism of advanced hybrid coupling and how it is modeled mathematically. Based on a test network, a case study shows to what extent and why advanced hybrid coupling leads to welfare gains during market coupling and lower congestion management costs in the flow-based region.
- ACER (2016). Market Monitoring Report 2016. https://acer.europa.eu/Official_documents/Acts_of_the_Agency/Publication/ACER%20Market%20Monitoring%20Report%202016%20-%20ELECTRICITY.pdf, accessed on 20.12.2023.
- ACER (2019). ACER Decision on Core CCM: Annex I – Day-ahead capacity calculation methodology of the Core capacity calculation region. https://eepublicdownloads.entsoe.eu/clean-documents/nc-tasks/CORE%20-%20ANNEX%20I_III.pdf, accessed on 04.11.2023.
- ACER (2023). Overview of Action Plans and Derogations for the period 2020-2023. https://acer.europa.eu/sites/default/files/documents/Official_documents/Acts_of_the_Agency/Publications%20Annexes/ACER%20Report%20on%20the%20result%20of%20monitoring%20the%20MACZT%20Generic/ACER%20Report%20on%20the%20result%20of%20monitoring%20the%20MACZT%20Derogations.pdf, accessed on 27.02.2024.
- Core TSOs (2021). Introduction to Core FB MC - Workshop. https://hupx.hu/uploads/h%C3%ADrek/Introduction%20to%20Core%20FBMC%20workshop%20-%2022%20Nov%202021.pdf, accessed on 27.02.2024.
- Core TSOs (2022). Explanatory document to the second amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region. https://consultations.entsoe.eu/markets/core_2nd_dafb_ccm/supporting_documents/Explanatory%20Document_2nd_amendment_Core%20DA%20CCM%20.pdf, accessed on 09.11.2023.
- Core TSOs (2023). Second amendment of the Day-Ahead Capacity Calculation Methodology of the Core Capacity Calculation Region. https://www.acm.nl/system/files/documents/bijlage-2-voorstel-tweede-wijziging-day-ahead-capaciteitsberekening-core.pdf, accessed on 27.02.2024.
- Council of the European Union and European Parliament (2019). Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity. Official Journal of the European Union L, 158:54–124. Accessed on 05.10.2020.
- CWE TSOs (2011). CWE Enhanced Flow-Based MC feasibility report v2.0. https://www.amprion.net/Dokumente/Strommarkt/Engpassmanagement/CWE-Market-Coupling/CWE_FB-MC_feasibility_report_2.0_19102011.pdf, accessed on 20.12.2023.
- CWE TSOs (2014). CWE FBMC approval document v2.1. https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/NetzzugangUndMesswesen/Marktkopplung/140530%20%20CWE%20FB%20MC%20Approval%20document.pdf?__blob=publicationFile&v=1, accessed on 20.12.2023.
- Ember (2023). Electricity Interconnection in Europe. https://ember-climate.org/data/data-tools/electricity-interconnection-europe/, accessed on 22.12.2023.
- ENTSO-E (2022). Determination of capacity calculation regions: All TSOs’ proposal for amendment of the Determination of capacity calculation regions methodology in accordance with Article 15(1) of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (12 October 2022). https://www.nve.no/media/14782/proposal-from-statnett-to-rme-on-determination-of-ccrs.pdf, accessed on 21.12.2023.
- ENTSO-E (2023). TYNDP 2022 Projects Sheets. https://tyndp2022-project-platform.azurewebsites.net/projectsheets, accessed on 21.12.2023.
- Direct calculation of line outage distribution factors. IEEE Transactions on Power Systems, 24(3):1633–1634.
- MapCharts (2023). Europe. https://www.mapchart.net/europe.html, accessed on 21.12.2023.
- Nordic CCM Project (2023). News Update: Nordic Flow-based Market Coupling Go-live expected October 2024. https://nordic-rcc.net/wp-content/uploads/2023/11/News-update-7-November-2023.pdf, accessed on 27.02.2024.
- Toward a fundamental understanding of flow-based market coupling for cross-border electricity trading. Advances in Applied Energy, 2:100027.