Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
133 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
46 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Cost Functions over Feasible Power Transfer Regions of Virtual Power Plants (2112.01188v1)

Published 2 Dec 2021 in eess.SY and cs.SY

Abstract: A virtual power plant (VPP) facilitates the integration of distributed energy resources (DERs) for the transmission-level operation. A challenge in operating a VPP is to characterize the cost function over its feasible power transfer region under DERs' uncertainties. To address this challenge, a characterization method is presented in this paper for the intraday operation of a VPP based on the concepts of nonanticipativity and robustness to DERs' uncertainties. The characterization stems from designing a second-order cone programming (SOCP) problem, based on which a feasible power transfer region across all time periods is constructed by exploring boundary points at each time period and establishing time coupling constraints. Furthermore, a cost function over the feasible power transfer region is formulated as a convex piecewise surface whose breakpoints are obtained by solving SOCP problems, together with a constant compensation cost from a linear programming problem. Finally, to alleviate the heavy computational burden brought by numerous DERs, an approximation method is presented by identifying the critical DERs whose uncertainties have dominant impacts. The effectiveness of the presented methods is verified by the numerical experiments in a 3-bus system and the IEEE 136-bus system.

Citations (6)

Summary

We haven't generated a summary for this paper yet.