Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
134 tokens/sec
GPT-4o
9 tokens/sec
Gemini 2.5 Pro Pro
47 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

The Maintenance Scheduling and Location Choice Problem for Railway Rolling Stock (2103.00454v1)

Published 28 Feb 2021 in math.OC and cs.DM

Abstract: Due to increasing railway use, the capacity at railway yards and maintenance locations is becoming limiting. Therefore, the scheduling of rolling stock maintenance and the choice regarding optimal locations to perform maintenance is increasingly complicated. This research introduces a Maintenance Scheduling and Location Choice Problem (MSLCP). It simultaneously determines maintenance locations and maintenance schedules of rolling stock, while it also considers the available capacity of maintenance locations, measured in the number of available teams. To solve the MSLCP, an optimization framework based on Logic-Based Benders' Decomposition (LBBD) is proposed by combining two models, the Maintenance Location Choice Problem (MLCP) and the Activity Planning Problem (APP), to assess the capacity of a MLCP solution. Within the LBBD, four cut generation procedures are introduced to improve the computational performance: a naive procedure, two heuristic procedures and the so-called min-cut procedure that aims to exploit the specific characteristics of the problem at hand. The framework is demonstrated on a realistic scenarios from the Dutch railways. It is shown that the best choice for cut generation procedure depends on the objective: when aiming to find a good but not necessarily optimal solution, the min-cut procedure performs best, whereas when aiming for the optimal solution, one of the heuristic procedures is the preferred option. The techniques used in the current research are new to the current field and offer interesting next research opportunities.

Summary

We haven't generated a summary for this paper yet.