Papers
Topics
Authors
Recent
Search
2000 character limit reached

Optimal Scheduling and Exact Response Time Analysis for Multistage Jobs

Published 17 May 2018 in cs.PF and math.OC | (1805.06865v2)

Abstract: Scheduling to minimize mean response time in an M/G/1 queue is a classic problem. The problem is usually addressed in one of two scenarios. In the perfect-information scenario, the scheduler knows each job's exact size, or service requirement. In the zero-information scenario, the scheduler knows only each job's size distribution. The well-known shortest remaining processing time (SRPT) policy is optimal in the perfect-information scenario, and the more complex Gittins policy is optimal in the zero-information scenario. In real systems the scheduler often has partial but incomplete information about each job's size. We introduce a new job model, that of multistage jobs, to capture this partial-information scenario. A multistage job consists of a sequence of stages, where both the sequence of stages and stage sizes are unknown, but the scheduler always knows which stage of a job is in progress. We give an optimal algorithm for scheduling multistage jobs in an M/G/1 queue and an exact response time analysis of our algorithm.

Citations (8)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.