Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
173 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
46 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

CUBES, the Cassegrain U-Band Efficient Spectrograph: towards final design review (2412.03460v1)

Published 4 Dec 2024 in astro-ph.IM

Abstract: In the era of Extremely Large Telescopes, the current generation of 8-10m facilities are likely to remain competitive at ground-UV wavelengths for the foreseeable future. The Cassegrain U-Band Efficient Spectrograph (CUBES) has been designed to provide high instrumental efficiency ( $>$ 37\%) observations in the near UV (305-400 nm requirement, 300-420 nm goal) at a spectral resolving power of R $>$ 20, 000 (with a lower-resolution, sky-limited mode of R $\sim$ 7, 000). With the design focusing on maximizing the instrument throughput (ensuring a Signal to Noise Ratio -SNR- $\sim$ 20 per spectral resolution element at 313 nm for U $\sim$ 17.5 mag objects in 1h of observations), it will offer new possibilities in many fields of astrophysics: i) access to key lines of stellar spectra (e.g. lighter elements, in particular Beryllium), extragalactic studies (e.g. circumgalactic medium of distant galaxies, cosmic UV background) and follow-up of explosive transients. We present the CUBES instrument design, currently in Phase-C and approaching the final design review, summarizing the hardware architecture and interfaces between the different subsystems as well as the relevant technical requirements. We describe the optical, mechanical, electrical design of the different subsystems (from the telescope adapter and support structure, through the main opto-mechanical path, including calibration unit, detector devices and cryostat control, main control electronics), detailing peculiar instrument functions like the Active Flexure Compensation (AFC). Furthermore, we outline the AITV concept and the main instrument operations giving an overview of its software ecosystem. Installation at the VLT is planned for 2028-2029 and first science operations in late 2029.

Citations (1)

Summary

We haven't generated a summary for this paper yet.