Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
144 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
46 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Sequential FDR and pFDR control under arbitrary dependence, with application to pharmacovigilance database monitoring (2406.01218v2)

Published 3 Jun 2024 in stat.ME

Abstract: We propose sequential multiple testing procedures which control the false discover rate (FDR) or the positive false discovery rate (pFDR) under arbitrary dependence between the data streams. This is accomplished by "optimizing" an upper bound on these error metrics for a class of step down sequential testing procedures. Both open-ended and truncated versions of these sequential procedures are given, both being able to control both the type~I multiple testing metric (FDR or pFDR) at specified levels, and the former being able to control both the type I and type II (e.g., FDR and the false nondiscovery rate, FNR). In simulation studies, these procedures provide 45-65% savings in average sample size over their fixed-sample competitors. We illustrate our procedures on drug data from the United Kingdom's Yellow Card Pharmacovigilance Database.

Summary

We haven't generated a summary for this paper yet.