Papers
Topics
Authors
Recent
Search
2000 character limit reached

Indirect Job-Shop coding using rank: application to QAOA (IQAOA)

Published 28 Feb 2024 in quant-ph and cs.DM | (2402.18280v1)

Abstract: The Job-Shop Scheduling Problem (JSSP) stands as one of the most renowned challenges in scheduling. It is characterized as a disjunctive problem, wherein a solution is fully depicted through an oriented disjunctive graph, with earliest starting times computed using a longest path algorithm. The complexity of solving this problem arises in part from the requirement that disjunctive graphs representing solutions must be acyclic. Consequently, enumerating these graphs is feasible for small-scale instances only. A significant advancement in this field, credited to (Bierwith, 1995), is the introduction of the 'vector by repetition' (commonly known as Bierwith's vector). Notably, this vector possesses the property that it can be mapped to an acyclic disjunctive graph, thereby enabling the mapping of a vector to a solution. This property has facilitated the development of highly efficient resolution schemes, as it allows the enumeration of solutions only i.e. acyclic disjunctive graphs. Our objective is to demonstrate how Bierwith's vector can be integrated into a Quantum Approximate Optimization Algorithm (QAOA) to tackle the job-shop problem using a novel quantum approach.

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 2 tweets with 0 likes about this paper.