Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
157 tokens/sec
GPT-4o
8 tokens/sec
Gemini 2.5 Pro Pro
46 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Exploding AI Power Use: an Opportunity to Rethink Grid Planning and Management (2311.11645v2)

Published 20 Nov 2023 in cs.DC, cs.SY, and eess.SY

Abstract: The unprecedented rapid growth of computing demand for AI is projected to increase global annual datacenter (DC) growth from 7.2% to 11.3%. We project the 5-year AI DC demand for several power grids and assess whether they will allow desired AI growth (resource adequacy). If not, several "desperate measures" -- grid policies that enable more load growth and maintain grid reliability by sacrificing new DC reliability are considered. We find that two DC hotspots -- EirGrid (Ireland) and Dominion (US) -- will have difficulty accommodating new DCs needed by the AI growth. In EirGrid, relaxing new DC reliability guarantees increases the power available to 1.6x--4.1x while maintaining 99.6% actual power availability for the new DCs, sufficient for the 5-year AI demand. In Dominion, relaxing reliability guarantees increases available DC capacity similarly (1.5x--4.6x) but not enough for the 5-year AI demand. New DCs only receive 89% power availability. Study of other US power grids -- SPP, CAISO, ERCOT -- shows that sufficient capacity exists for the projected AI load growth. Our results suggest the need to rethink adequacy assessment and also grid planning and management. New research opportunities include coordinated planning, reliability models that incorporate load flexibility, and adaptive load abstractions.

Citations (2)

Summary

We haven't generated a summary for this paper yet.

X Twitter Logo Streamline Icon: https://streamlinehq.com

Tweets