Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
184 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Risk-Aware Dimensioning and Procurement of Contingency Reserve (2106.00144v2)

Published 31 May 2021 in eess.SY and cs.SY

Abstract: Current contingency reserve criteria ignore the likelihood of individual contingencies and, thus, their impact on system reliability and risk. This paper develops an iterative approach, inspired by the current security-constrained unit commitment (SCUC) practice, enabling system operators to determine risk-cognizant contingency reserve requirements and their allocation with minimal alterations to the current SCUC practice. The proposed approach uses generator and transmission system reliability models, including failure-to synchronize and adverse conditions, to compute contingency probabilities, which inform a risk-based system reliability assessment, and ensures reserve deliverability by learning the response of generators to post-contingency states within the SCUC. The effectiveness of the proposed approach is demonstrated using the Grid Modernization Lab Consortium update of the Reliability Test System.

Citations (13)

Summary

We haven't generated a summary for this paper yet.