Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
158 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Flexibility-constrained Operation Scheduling of Active Distribution Networks with Microgrids (2012.06855v1)

Published 12 Dec 2020 in eess.SY and cs.SY

Abstract: Regarding the variability of renewable energy sources (RESs), especially in the operation time periods, their high penetration faces the net load pattern of the power system with a major ramp rate challenge. Although employing a market-based mechanism by the independent system operator (ISO) can address this challenge, it may not be possible to handle this challenge in all networks. In such networks, the required flexibility can be supplied by decreasing the ramp rate of the purchased power of distribution companies (Discos) from the market since their net load has an important impact on the system's netload. Therefore, a flexibility-constrained operation problem for the distribution networks with distributed energy resources (DERs) and microgrids (MGs) is proposed in this paper to decrease the ramp-rate of the Disco's purchased power from the market. This problem is formulated using a bi-level two-stage stochastic model where the problem of the Disco and the MGs are modeled as the upper-level and lower-level problems, respectively. The proposed model is applied to the IEEE 33-bus standard test network with three MGs. The results show the effectiveness of the proposed model to decrease the ramp-rate of the Disco's purchased power from the market.

Citations (9)

Summary

We haven't generated a summary for this paper yet.