Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

On the computational complexity of uncapacitated multi-plant lot-sizing problems (2003.04438v1)

Published 9 Mar 2020 in math.OC and cs.CC

Abstract: Production and inventory planning have become crucial and challenging in nowadays competitive industrial and commercial sectors, especially when multiple plants or warehouses are involved. In this context, this paper addresses the complexity of uncapacitated multi-plant lot-sizing problems. We consider a multi-item uncapacitated multi-plant lot-sizing problem with fixed transfer costs and show that two of its very restricted special cases are already NP-hard. Namely, we show that the single-item uncapacitated multi-plant lot-sizing problem with a single period and the multi-item uncapacitated two-plant lot-sizing problem with fixed transfer costs are NP-hard. Furthermore, as a direct implication of the proven results, we also show that a two-echelon multi-item lot-sizing with joint setup costs on transportation is NP-hard.

Citations (5)

Summary

We haven't generated a summary for this paper yet.