Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
158 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Multi-Robot Path Planning Using Medial-Axis-Based Pebble-Graph Embedding (2002.11892v4)

Published 27 Feb 2020 in cs.RO

Abstract: We present a centralized algorithm for labeled, disk-shaped Multi-Robot Path Planning (MPP) in a continuous planar workspace with polygonal boundaries. Our method automatically transform the continuous problem into a discrete, graph-based variant termed the pebble motion problem, which can be solved efficiently. To construct the underlying pebble graph, we identify inscribed circles in the workspace via a medial axis transform and organize robots into layers within each inscribed circle. We show that our layered pebble-graph enables collision-free motions, allowing all graph-restricted MPP instances to be feasible. MPP instances with continuous start and goal positions can then be solved via local navigations that route robots from and to graph vertices. We tested our method on several environments with high robot-packing densities (up to $61.6\%$ of the workspace). For environments with narrow passages, such density violates the well-separated assumptions made by state-of-the-art MPP planners, while our method achieves an average success rate of $83\%$.

Citations (1)

Summary

We haven't generated a summary for this paper yet.