Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
156 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

A Solution Strategy to the Unit Commitment Problem Incorporating Manifold Uncertainties (2001.00752v1)

Published 3 Jan 2020 in eess.SY and cs.SY

Abstract: The widespread uncertainties have made the interaction between wind power and power grid more complicated and difficult to model and handle. This paper proposes an approach for the solution of unit commitment (UC) problem incorporating multiple uncertainties that exist in both wind power and power grid inherently, consisting of probability, possibility, and interval measures. To handle the manifold uncertainties in a comprehensive and efficient manner, the evidence theory (ET) is applied to fuse these uncertain variables into Dempster-Shafer structure. Moreover, the power loss is introduced into power balance constraints, and the extended affine arithmetic (EAA) is employed to evaluate the uncertainty of power loss caused by the propagation of the aforementioned uncertainties. Regarding the mix-discrete nonlinear characteristics of the established optimization model, an enhanced grey wolf optimizer (GWO) algorithm is developed to solve the proposed model. Specifically, the corresponding commitment schedule is determined by a kind of binary grey wolf optimizer (BGWO), and the economic dispatch (ED) is settled by GWO. Finally, the IEEE 30-bus test system and a real-sized 183-bus China power system are studied to demonstrate the validity and scalability of the proposed model and method.

Summary

We haven't generated a summary for this paper yet.