Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
153 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Extracting physical power plant parameters from historical behaviour (1909.03661v1)

Published 9 Sep 2019 in eess.SY and cs.SY

Abstract: The information needed for fundamental modelling of the power markets -- the efficiency, start-up, fixed, and variable operating costs of each power plant -- is not publicly available. These parameters are usually estimated by considering the type of technology and the age of a power plant. We present a method to extract these parameters for thermal power plants on the British electricity market using only the publicly available data. For each power plant, we solve a bilevel optimisation problem, where the inner level solves the Unit Commitment (UC) problem and outputs the optimal schedule given the prices of fuel, emissions, electricity, and the unknown plant parameters. The outer level then optimises over the plant parameters matching the historical production of each plant as closely as possible.

Citations (3)

Summary

We haven't generated a summary for this paper yet.