Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
132 tokens/sec
GPT-4o
28 tokens/sec
Gemini 2.5 Pro Pro
42 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Integrating Project Spatial Coordinates into Pavement Management Prioritization (1811.03437v1)

Published 5 Nov 2018 in cs.CY, cs.LG, and stat.ML

Abstract: To date, pavement management software products and studies on optimizing the prioritization of pavement maintenance and rehabilitation (M&R) have been mainly focused on three parameters; the pre-treatment pavement condition, the rehabilitation cost, and the available budget. Yet, the role of the candidate projects' spatial characteristics in the decision-making process has not been deeply considered. Such a limitation, predominately, allows the recommended M&R projects' schedule to involve simultaneously running but spatially scattered construction sites, which are very challenging to monitor and manage. This study introduces a novel approach to integrate pavement segments' spatial coordinates into the M&R prioritization analysis. The introduced approach aims at combining the pavement segments with converged spatial coordinates to be repaired in the same timeframe without compromising the allocated budget levels or the overall target Pavement Condition Index (PCI). Such a combination would result in minimizing the routing of crews, materials and other equipment among the construction sites and would provide better collaborations and communications between the pavement maintenance teams. Proposed herein is a novel spatial clustering algorithm that automatically finds the projects within a certain budget and spatial constrains. The developed algorithm was successfully validated using 1,800 pavement maintenance projects from two real-life examples of the City of Milton, GA and the City of Tyler, TX.

Summary

We haven't generated a summary for this paper yet.