Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
169 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Open problem on risk-aware planning in the plane (1612.05101v2)

Published 15 Dec 2016 in cs.CG

Abstract: We consider the problem of planning a collision-free path of a robot in the presence of risk zones. The robot is allowed to travel in these zones but is penalized in a super-linear fashion for consecutive accumulative time spent there. We recently suggested a natural cost function that balances path length and risk-exposure time. When no risk zones exists, our problem resorts to computing minimal-length paths which is known to be computationally hard in the number of dimensions. It is well known that in two-dimensions computing minimal-length paths can be done efficiently. Thus, a natural question we pose is "Is our problem computationally hard or not?" If the problem is hard, we wish to find an approximation algorithm to compute a near-optimal path. If not, then a polynomial-time algorithm should be found.

Citations (1)

Summary

We haven't generated a summary for this paper yet.