Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
167 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
42 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

SLI, a New Metric to determine Success of a Software Project (1407.8377v1)

Published 31 Jul 2014 in cs.SE

Abstract: Project Management process plays a critical role in managing factors such as cost, time, technology and personnel towards achieving the success of a project and henceforth the sustainability of the company in the industrial market. This paper emphasizes empirical study of several projects developed over a period of time in a product and service based CMMI Level 5 Software Company. The investigation shows impact analysis of resources such as cost, time, and number of developers towards the successful completion of the project as allocated by the project manager during the developmental process. The analysis has further led to the introduction of a new qualitative metric, Success Level Index Metric (SLI) whose index value varies from 0 to 1. SLI acts as a maturity indicator that indicates the degree of maturity of the company in terms of success of their projects based on which the company can choose their desired level of success for their projects.

Citations (4)

Summary

We haven't generated a summary for this paper yet.