Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
158 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Revisiting Size-Based Scheduling with Estimated Job Sizes (1403.5996v3)

Published 24 Mar 2014 in cs.DS

Abstract: We study size-based schedulers, and focus on the impact of inaccurate job size information on response time and fairness. Our intent is to revisit previous results, which allude to performance degradation for even small errors on job size estimates, thus limiting the applicability of size-based schedulers. We show that scheduling performance is tightly connected to workload characteristics: in the absence of large skew in the job size distribution, even extremely imprecise estimates suffice to outperform size-oblivious disciplines. Instead, when job sizes are heavily skewed, known size-based disciplines suffer. In this context, we show -- for the first time -- the dichotomy of over-estimation versus under-estimation. The former is, in general, less problematic than the latter, as its effects are localized to individual jobs. Instead, under-estimation leads to severe problems that may affect a large number of jobs. We present an approach to mitigate these problems: our technique requires no complex modifications to original scheduling policies and performs very well. To support our claim, we proceed with a simulation-based evaluation that covers an unprecedented large parameter space, which takes into account a variety of synthetic and real workloads. As a consequence, we show that size-based scheduling is practical and outperforms alternatives in a wide array of use-cases, even in presence of inaccurate size information.

Citations (28)

Summary

We haven't generated a summary for this paper yet.