Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
125 tokens/sec
GPT-4o
53 tokens/sec
Gemini 2.5 Pro Pro
42 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
47 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Investigating Effort Prediction of Software Projects on the ISBSG Dataset (1204.2404v1)

Published 11 Apr 2012 in cs.SE

Abstract: Many cost estimation models have been proposed over the last three decades. In this study, we investigate fuzzy ID3 decision tree as a method for software effort estimation. Fuzzy ID software effort estimation model is designed by incorporating the principles of ID3 decision tree and the concepts of the fuzzy settheoretic; permitting the model to handle uncertain and imprecise data when presenting the software projects. MMRE (Mean Magnitude of Relative Error) and Pred(l) (Prediction at level l) are used, as measures of prediction accuracy, for this study. A series of experiments is reported using ISBSG software projects dataset. Fuzzy trees are grown using different fuzziness control thresholds. Results showed that optimizing the fuzzy ID3 parameters can improve greatly the accuracy of the generated software cost estimate.

Citations (11)

Summary

We haven't generated a summary for this paper yet.